Friday, 23 July 2010

Casting concrete


5 pm start casting concrete
but how many people work for this?


6 pm 1/3 area done turn spot light on
start little rain


7 pm 2/3 done but the rain begun strong
the last truck arrived after 30 minute
people already tired


8 pm almost finished casting concrete
Please do not casting concrete at night
aaa!!Go mone!!

Reinforcing rods

After we installed pipe system
the people spend 3 days for instsll reinforcing steel bar?

Plumbing system of toilet

Installed PVC pipe for sewage system
we excaveted about 1m depth, during that time
often had heavy rain it was so difficult
but we done!!

Monday, 19 July 2010


The photo is under ground water tank of fire fighting system, the blue pipe are PVC pipe sleve for suction pipe of punp.
Now is rainy seasons, everyday heavily rain here so it mean difficult follow the schedule

My work site


Hello
This is one of the site area photo
behinde is house of vietnam people
they living around this area